|
||||||||||||||||||||||
|
![]() |
SCHEME B |
![]() 2A | ![]() |
||||||||||||||||||
![]() |
||||||||||||||||||||||
Two primary half-loops with shared boiler and pump. One-boiler scheme for a large number of contours with high input temperature requirements. Overall contour power of the left and the right wing should not differ significiantly.
|
- 1 1/4” boiler. 3 groups with interaxal of 90mm |
![]() |
||||||||||||||||||||